DESIGN OF TEMPORARY WORKS
|
|
����������� Go to the INDEX page
����������� Larsen
design has a strong background in the design of temporary works in the field of
engineering working with contractors. The projects varied from design of � temporary structures, Formwork, Girder
Erection equipment and design of a stressing bed for casting of pre-stressed
bridge units. Below are some�
projects where �� Larsen
Design designed temporary Works.
��������������� ��������������� 1. Sydney Harbour Tunnel Project Australia - Batching Plant
����������� ����������� 2. Design of
formwork for bridges at Old Illawarra Road and
Brushwood Drive, Sydney, NSW Australia
|
|
�
���

|
|
�������
|
|
Project:
�Railway Bridge over Western Freeway
F4 at� Lapstone
Steel Bowstring Arch Design
Client:��
Barclay Mowlem Construction
Limited
Larsen Design was commissioned to design the support
Structure for the Bridge during the erection.
|
|
����������� �Go to the INDEX page